Sep 6 2009

Bricklayers have completed the chimney’s

Both chimneys are now up just need to get the roofers to dress the lead once they have got the roof tiles on.

Aug 25 2009

Roof glazing bars installed today

Today we have had the Glazers in to fit the roof bars for the roof window that will allow has views of the gardens from the gallery landing, it will also make our sitting room very light and airy.
There was a lot of discussion as to why Welsh Oak Frame have designed the Oak frame [...]

Jun 26 2009

Open Eaves

Having chosen some exposed rafters in the Master bedroom and in the sitting room at the design stage we decided to have conventional ceilings in the other bedrooms. We did this for to go this route mainly because of the extra cost having Oak rafters throughout.
Once Welsh Oak left the first thing I did was [...]

Jun 12 2009

Changes to the frame

I have been away for a few days so I have not had a chance to post also while I was away the frame erectors found there had been a slight error on the truses on the gable ends.
I had not realised that the drawing showed some of the softwood rafters on 2 of the [...]

Page 1 of 3123»
eXTReMe Tracker
Blog Directory

Blogroll