Mar 29 2009

Received our bricks approval

Yesterday we finally received the brick, roof tile and driveway materials approval from the council so first thing on Monday morning I will get in contact with my Tudor Roof Tile rep and finalise the tiles. Although I have been dealing with the Hogkins Bricks rep regarding quantities and specials brick they will only take [...]

Mar 24 2009

Completed the concrete slab

The membrane was laid out first thing in the morning and as the wind was getting up it needed to weighed down with anything we could lay our hands on to stop it blowing away. The NHBC surveyor and the local DS had been booked the previous day so that they could inspect the site [...]

Mar 19 2009

Preparing for the concrete slab

We started the slab make up with 2 lorries of crushed concrete  which was spread out across the site and then a vibrating “whacker”  plate was used to compact the crushed concrete to provide a solid base for the rest of the slab. Once the based was packed down solid a lorry load of sand [...]

Mar 14 2009

Block work upto slab

We are upto slab level with the block work,  the ground was not as level as I had first thought which will give us about 6 course’s of face work on one corner which is not to much of a drama. Once the slab has been laid we will have another coarse of block work [...]