<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>NewBuild.co.uk &#187; machines</title>
	<atom:link href="http://www.newbuild.co.uk/blog/tag/machines/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.newbuild.co.uk/blog</link>
	<description>Foolow us on our Oak frame Self build</description>
	<lastBuildDate>Tue, 27 Oct 2009 22:17:20 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.1</generator>
		<item>
		<title>Concreted footings today</title>
		<link>http://www.newbuild.co.uk/blog/concreted-footings-today/</link>
		<comments>http://www.newbuild.co.uk/blog/concreted-footings-today/#comments</comments>
		<pubDate>Wed, 25 Feb 2009 22:58:15 +0000</pubDate>
		<dc:creator>New Builder</dc:creator>
				<category><![CDATA[Building Materials]]></category>
		<category><![CDATA[General]]></category>
		<category><![CDATA[Professsional]]></category>
		<category><![CDATA[Trades]]></category>
		<category><![CDATA[footings]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[self build]]></category>
		<category><![CDATA[Add new tag]]></category>
		<category><![CDATA[concrete]]></category>
		<category><![CDATA[ground work]]></category>
		<category><![CDATA[machines]]></category>
		<category><![CDATA[NHBC]]></category>

		<guid isPermaLink="false">http://www.newbuild.co.uk/blog/?p=102</guid>
		<description><![CDATA[3 day&#8217;s in and things have gone well. We hit chalk at around 800 mm in the majority of the excavation except on the chimney side where we went down 1 meter and left it for the DS and NHBC inspection. The District Surveyor was OK with everything but requested another .5 of a meter [...]<script type="text/javascript">SHARETHIS.addEntry({ title: "Concreted footings today", url: "http://www.newbuild.co.uk/blog/concreted-footings-today/" });</script>]]></description>
			<content:encoded><![CDATA[<p>3 day&#8217;s in and things have gone well.</p>
<p>We hit chalk at around 800 mm in the majority of the excavation except on the chimney side where we went down 1 meter and left it for the DS and NHBC inspection.</p>
<p>The District Surveyor was OK with everything but requested another .5 of a meter in the chimney end and then signed off for concreting. The NHBC Surveyor however required has to go a meter all round and agreed with the DS on the chimney end, as it was still early in the afternoon there was plenty of time to get the required work done.</p>
<p>So first thing this morning the first of 7 mixers arrived, they could not get them right up close so had to user a dumper to run a pour. Never the less pouring was completed by a liitle past 5 pm.</p>
<p>The bricklayers are coming out tomorrow to make sure the footing are OK and to firm up the price and we should be good to go getting up to DPC after the weekend.</p>
<p><a href="http://sharethis.com/item?&wp=3.0.1&amp;publisher=1077fff1-d714-435a-8b72-a94792b29154&amp;title=Concreted+footings+today&amp;url=http%3A%2F%2Fwww.newbuild.co.uk%2Fblog%2Fconcreted-footings-today%2F">ShareThis</a></p>]]></content:encoded>
			<wfw:commentRss>http://www.newbuild.co.uk/blog/concreted-footings-today/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ground works start today.</title>
		<link>http://www.newbuild.co.uk/blog/ground-works-start-today/</link>
		<comments>http://www.newbuild.co.uk/blog/ground-works-start-today/#comments</comments>
		<pubDate>Mon, 23 Feb 2009 23:31:39 +0000</pubDate>
		<dc:creator>New Builder</dc:creator>
				<category><![CDATA[Gates]]></category>
		<category><![CDATA[General]]></category>
		<category><![CDATA[Professsional]]></category>
		<category><![CDATA[Trades]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[self build]]></category>
		<category><![CDATA[footings]]></category>
		<category><![CDATA[ground work]]></category>
		<category><![CDATA[jcb]]></category>
		<category><![CDATA[machines]]></category>

		<guid isPermaLink="false">http://www.newbuild.co.uk/blog/?p=93</guid>
		<description><![CDATA[Got started today. The ground workers delivered their plant on Saturday and I met them first thing this morning to assist with the marking the site out. We soon realised I had cocked up and one of the sheds was just to close to the site so it had to come down before we could [...]<script type="text/javascript">SHARETHIS.addEntry({ title: "Ground works start today.", url: "http://www.newbuild.co.uk/blog/ground-works-start-today/" });</script>]]></description>
			<content:encoded><![CDATA[<p>Got started today. The ground workers delivered their plant on Saturday and I met them first thing this morning to assist with the marking the site out. We soon realised I had cocked up and one of the sheds was just to close to the site so it had to come down before we could mark the site out proper.</p>
<p>Chris then spent the rest of the day scraping off the top spoil and making a start on the actual footings.</p>
<p><a href="http://www.newbuild.co.uk/blog/wp-content/uploads/2009/02/dsc00380.jpg"><img class="size-medium wp-image-94 aligncenter" title="dsc00380" src="http://www.newbuild.co.uk/blog/wp-content/uploads/2009/02/dsc00380-300x225.jpg" alt="dsc00380" width="300" height="225" /></a></p>
<p>We expect to get the footings completed by late tomorrow and I have today arranged a site visit by both NHBC and building control and as we have hit chalk at just over 800 mm we should be able to get the concrete delivered on Wednesday.</p>
<p><a href="http://www.newbuild.co.uk/blog/wp-content/uploads/2009/02/dsc00381.jpg"><img class="size-medium wp-image-95 alignnone" title="dsc00381" src="http://www.newbuild.co.uk/blog/wp-content/uploads/2009/02/dsc00381-300x225.jpg" alt="dsc00381" width="300" height="225" /></a></p>
<p><a href="http://sharethis.com/item?&wp=3.0.1&amp;publisher=1077fff1-d714-435a-8b72-a94792b29154&amp;title=Ground+works+start+today.&amp;url=http%3A%2F%2Fwww.newbuild.co.uk%2Fblog%2Fground-works-start-today%2F">ShareThis</a></p>]]></content:encoded>
			<wfw:commentRss>http://www.newbuild.co.uk/blog/ground-works-start-today/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

