Feb 25 2009

Concreted footings today

3 day’s in and things have gone well. We hit chalk at around 800 mm in the majority of the excavation except on the chimney side where we went down 1 meter and left it for the DS and NHBC inspection. The District Surveyor was OK with everything but requested another .5 of a meter [...]