May 19 2009
First floor Oak is going up
- 0 Comments
The lads from Welsh Oak are now putting up the Oak to form first floor which has Oak exposed both externally and internally as opposed to the ground floor which has a brick facad with the only exposed on the inside.
As part of the concession we agreed with the planning department to get planning we lowered the roof on half the house with dormers, you can see in the picture below the Oak that forms the walls to that part of the house.
Below the Oak trusses are being lifted in place, these trusses will form the master bedroom with vaulted ceiling, walk in wardrobe and on suite bathroom.