Changes to the frame
I have been away for a few days so I have not had a chance to post also while I was away the frame erectors found there had been a slight error on the truses on the gable ends. I had not realised that the drawing showed some of the softwood rafters on 2 of [...]
Oak in the final stages
Back from the bank holiday break the Oak Frame is in the final stages of completion, there is one gable end and a stack of rafters to be lifted into place and then most of the first floor frame joints will need to be pinned. I have contacted www.oakcleaning.co.uk to get some idea of the [...]
Oak Frame is here!!
This morning I was up and about early despite a bit of a family get together yesterday as we were having a forklift delivered to the site to unload the Oak frame. As we had been let down on a couple of occasions on the frame delivery I was relieved to get a call from [...]
Welsh Oak visited the site
Met up with our Welsh Oak Frames project manager Keith at lunchtime, he needed to take a look at the site in preparation for the oak frame delivery. He also wanted to check our groundwork measurements for accuracy and run through the scaffolding drawing’s that Welsh Oak had already provided showing where they required scaffolding [...]