<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>NewBuild.co.uk &#187; Rendering</title>
	<atom:link href="http://www.newbuild.co.uk/blog/category/rendering/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.newbuild.co.uk/blog</link>
	<description>Foolow us on our Oak frame Self build</description>
	<lastBuildDate>Tue, 27 Oct 2009 22:17:20 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.1</generator>
		<item>
		<title>Frame now complete</title>
		<link>http://www.newbuild.co.uk/blog/frame-now-complete/</link>
		<comments>http://www.newbuild.co.uk/blog/frame-now-complete/#comments</comments>
		<pubDate>Tue, 23 Jun 2009 10:55:17 +0000</pubDate>
		<dc:creator>New Builder</dc:creator>
				<category><![CDATA[Rendering]]></category>
		<category><![CDATA[oak frame]]></category>
		<category><![CDATA[insulation]]></category>
		<category><![CDATA[lime render]]></category>
		<category><![CDATA[new build]]></category>

		<guid isPermaLink="false">http://www.newbuild.co.uk/blog/?p=262</guid>
		<description><![CDATA[Welsh Oak have now completed the frame erection and have now left the site. They have left another Welsh Oak team to complete the lead work around the windows. They have also been inserting the panels in between the exposed Oak in the external wall or the first floor. The panels are made up of [...]<script type="text/javascript">SHARETHIS.addEntry({ title: "Frame now complete", url: "http://www.newbuild.co.uk/blog/frame-now-complete/" });</script>]]></description>
			<content:encoded><![CDATA[<p>Welsh Oak have now completed the frame erection and have now left the site.</p>
<p>They have left another Welsh Oak team to complete the lead work around the windows. They have also been inserting the panels in between the exposed Oak in the external wall or the first floor. The panels are made up of pre cut OSB board with a piece of 140 mm Kingspan attached providing the insulation inside.</p>
<p style="text-align: center;"><a href="http://www.newbuild.co.uk/blog/wp-content/uploads/2009/06/dsc00495.jpg"><img class="aligncenter size-large wp-image-263" title="first floor panels" src="http://www.newbuild.co.uk/blog/wp-content/uploads/2009/06/dsc00495-1024x768.jpg" alt="first floor panels" width="1024" height="768" /></a></p>
<p style="text-align: center;">Externally  there is a breathable membrane attached to the OSB board then a plastic lathe is stapled every   5 &#8211; 10 mm over the whole board then to finish the panel of there is a plastic render bead on the edges with a lead dressing on the lower edges making a really neat job.<a href="http://www.newbuild.co.uk/blog/wp-content/uploads/2009/06/dsc00498.jpg"><img class="aligncenter size-large wp-image-265" title="dsc00498" src="http://www.newbuild.co.uk/blog/wp-content/uploads/2009/06/dsc00498-1024x768.jpg" alt="dsc00498" width="1024" height="768" /></a></p>
<p style="text-align: left;">
<p style="text-align: left;">These panels will finally be coved by Lime Render which has a natural colour and wont need painting.</p>
<p><a href="http://sharethis.com/item?&wp=3.0.1&amp;publisher=1077fff1-d714-435a-8b72-a94792b29154&amp;title=Frame+now+complete&amp;url=http%3A%2F%2Fwww.newbuild.co.uk%2Fblog%2Fframe-now-complete%2F">ShareThis</a></p>]]></content:encoded>
			<wfw:commentRss>http://www.newbuild.co.uk/blog/frame-now-complete/feed/</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
	</channel>
</rss>

