Mar 14 2009

Block work upto slab

We are upto slab level with the block work,  the ground was not as level as I had first thought which will give us about 6 course’s of face work on one corner which is not to much of a drama. Once the slab has been laid we will have another coarse of block work [...]

Feb 25 2009

Concreted footings today

3 day’s in and things have gone well. We hit chalk at around 800 mm in the majority of the excavation except on the chimney side where we went down 1 meter and left it for the DS and NHBC inspection. The District Surveyor was OK with everything but requested another .5 of a meter [...]