Sep 7 2009

Window have arrived

Over the weekend we had the Oak window frames delivered to the site, this morning the Bob and Nick arrived to install them.

Sep 6 2009

Bricklayers have completed the chimney’s

Both chimneys are now up just need to get the roofers to dress the lead once they have got the roof tiles on.

Sep 1 2009

Installing Insulation Over The Exposed Oak

This week we have started started installing the Celotex insulation over the exposed Oak. This involves laying 12.5 mm foil backed plaster board directly on top of the Oak then a layer of 80 mm Celotex, roofing batten is then laid in the same direction as the Oak rafters and fixed in place with [...]

TAGS:
Aug 29 2009

Oak Window Frames

Our Oak window frames are now nearly ready for delivery so I went down to Bobs workshops to take a look. Things seem to be moving in the right direction again.